![]() With projects created in the previous version of PLUMBER (1.0), as well as those that are created without using the aforementioned importing option, the coordinates values have to be manually specified by the user in nodes and pipes data dialogs in order to benefit from this great feature. ![]() In the case of water networks created by importing files in DXF format these values will be taken from the graphic properties of the imported drawing objects. The Plan and Isometrics views creation in PLUMBER 2.0 is conditioned upon, at least, that the nodes that make up the water supply system have values other than 0 for its X and Y coordinates. You will see below this new feature’s details. With version 2 of PLUMBER, our software for water supply systems design in buildings, it is now possible to create Plan and Isometrics views of the water network you are designing. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |